Skip to content

[18.0][IMP] odoo_repository: replace oca-port dependency in tests#130

Merged
OCA-git-bot merged 1 commit intoOCA:18.0from
sebalix:18.0-odoo_repository-tests-replace_oca_port
Feb 24, 2026
Merged

[18.0][IMP] odoo_repository: replace oca-port dependency in tests#130
OCA-git-bot merged 1 commit intoOCA:18.0from
sebalix:18.0-odoo_repository-tests-replace_oca_port

Conversation

@sebalix
Copy link
Collaborator

@sebalix sebalix commented Feb 23, 2026

And cache generated git repository in memory to speed up tests execution.

oca-port tests common class was used initially as the need was identical: get a git repository to work on in tests, and focus on the development of features . But the plan was to get rid of it as soon as possible.

@sebalix sebalix added this to the 18.0 milestone Feb 23, 2026
And cache generated git repository in memory to speed up tests execution.
@sebalix sebalix force-pushed the 18.0-odoo_repository-tests-replace_oca_port branch from fe15f76 to 1ae08cc Compare February 23, 2026 20:10
@sebalix sebalix marked this pull request as ready for review February 24, 2026 14:59
@sebalix
Copy link
Collaborator Author

sebalix commented Feb 24, 2026

/ocabot merge patch

@OCA-git-bot
Copy link
Contributor

This PR looks fantastic, let's merge it!
Prepared branch 18.0-ocabot-merge-pr-130-by-sebalix-bump-patch, awaiting test results.

@OCA-git-bot OCA-git-bot merged commit 21a1289 into OCA:18.0 Feb 24, 2026
11 of 12 checks passed
@OCA-git-bot
Copy link
Contributor

Congratulations, your PR was merged at 09a57a8. Thanks a lot for contributing to OCA. ❤️

@sebalix sebalix deleted the 18.0-odoo_repository-tests-replace_oca_port branch February 24, 2026 15:03
@sebalix sebalix changed the title [IMP] odoo_repository: replace oca-port dependency in tests [18.0][IMP] odoo_repository: replace oca-port dependency in tests Feb 24, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants